AIRUS biogas blower dan vacuum pump di Indonesia untuk Project yang berikut:
PLTBg Pasir Mandoge (PTPN IV)
2,050 kW Biogas Power Plant Location : Pasir Mandoge, Asahan, Sumatera Utara. Status: On Progress (On – Grid PLN)
PLTBg Perdana Mill (Sinarmas)
2,400 kW Biogas Power Plant. Location : Desa Rungau Raya, Seruyan, Kalimatan Tengah. Status: On Progress
Methane Capture and Flaring – PT Meridan Sejati Surya Plantation (First Resources Group)
1500 m3/h Methane Capture and Flaring. Location : Desa Bangsal Aceh, Dumai, Riau. Status: On Progress
Methane Capture and Flaring – PT Pancasurya Agrindo (First Resources Group)
1500 m3/h Methane Capture and Flaring. Location : Kebun Tambusai, Rokan Hulu, Riau. Status: On Progress